Php 23,000 – Php 27,000 per sqm

A foundational material specification level focused on essential construction completion and simplified detailing.

Background.png

** Final construction cost depends on site conditions, structural complexity, and approved architectural scope.

hf_20260306_080806_f5445ffb-a7bb-4f76-ad68-464fed7abcfe.jpeg
Background 8.png
b electrical 2.png
b window 3.png
hf_20260306_081632_a9b7f80c-57b6-41b8-b172-8f0b660fab4a.jpeg
b tnb 3

Suggested Finish Specification

Ceiling System
Background 2.png
  • Ceiling Surface: Exposed Structural Slab
  • Edge Treatment: Direct Slab Edge
Flooring System
Background 3.png
Background 5.png
  • Main Areas: Smooth Cement Finish
  • Bedroom Areas: Smooth Cement Finish
Wall Finish System
hf_20260306_070937_ab1a318b-598d-48bf-9589-c933725586d7.jpeg
Background 4.png
  • Exterior Walls: Plain Cement Plaster
  • Interior Walls: Plain Cement Plaster
Window System
b widow 4.jpg
  • Frame System: Painted Steel Casement
  • Glass Glazing: Standard Clear Glass
Door & Hardware Package
  • Main Door Finish: Painted Flush
  • Interior Door Finish: Painted Flush
  • Toilet Door Finish: PVC
  • Lockset Finish: Basic Cylindrical Lockset
  • Hinge Finish: Standard Hinges
Electrical Device Package
  • Switch & Outlet Type: Surface-Mounted Devices
  • Cover Plate Finish: Standard Plastic Plate
Toilet & Bath Finish Package
  • Wall & Floor Finish: Ceramic Tile
  • Water Closet: Close-Coupled Single Flush System
  • Lavatory: Wall-mounted Lavatory
  • Waterproofing: Standard Wet-Area Protection
Lighting System
  • General Lighting: Surface-Mounted Fixtures
  • Accent Lighting: None
Stairs & Balcony Guardrail
  • Infill Material: Painted Steel Bars
  • Top Rail Finish: Painted Steel
  • Post & Frame Finish: Painted Steel Posts
b door 2.jpeg
b door 1.jpeg
b door 3.jpeg
hf_20260306_074909_f1518861-8930-4598-b7d2-de7724b556d7.jpeg
b lighting 1.png
hf_20260305_034418_7f5394b2-7dc5-48e1-b7ce-9d277962b710.png

Frequently Asked Questions

What is included in the Bare finish classification?
Is permit documentation included?

This classification defines the material and detailing level of architectural finishes. Structural systems, engineering supervision, and execution controls remain consistent across all tiers.

Permit documentation preparation is included under the planning framework. Approval timelines depend on local authority processing.

Can finishes be upgraded during construction?

Upgrades may be accommodated subject to documentation review, material availability, and cost adjustment procedures.

What warranty coverage applies?

Workmanship-related issues are covered under defined warranty terms. Structural components are protected under the 15-Year Structural Integrity Guarantee in accordance with approved engineering design.

Start With a Structured Finish Review.

We will evaluate your project scope and determine whether the Bare finish level aligns with your architectural direction, site conditions, and investment framework.